Schoettler Road Improvements


Map of Schoettler Road

The City of Chesterfield will be constructing an asphalt overlay of Schoettler Road in the summer of 2022. The project will include a two-inch mill of the existing asphalt pavement, pavement base repairs, replacement of failing curb and gutter sections, and a two-inch asphalt overlay on Schoettler Road between Georgetown Road and South Outer 40 Road. The existing asphalt pavement sections of Schoettler Road recently reconstructed as part of the Schoettler Road Bridge replacement project will receive a seal coat only. 

Construction is scheduled to commence during the week of June 6 and is scheduled to be completed before Parkway School District resumes classes in late August.

Traffic delays should be expected since traffic will be limited to alternating one-way traffic at times during working hours. Access will be maintained to each of the residential side streets at all times, but delays may be experienced. Traffic will be open to two-way traffic during non-working hours.

If you have any questions about the project, please contact Steve Merk at smerk@chesterfield.mo.us or at 636-537-4754.

Project Updates

10-21-2022 - Work is complete, and the project is closed out
08-11-2022
- Road paving and striping are complete. There are minor punchlist items that the contractor will need to address over the next 60 days, but the project is substantially complete. 

07-18-2022 - Paving will begin.

07-12-2022 -
80% of the milling has been completed as of today. Milling will continue on Thursday and will be completed by Friday. 

07-01-2022 - 
The contractor completed the concrete curb removal and replacement this week. Existing asphalt surface milling and full-depth pavement base repair work will begin the week of July 11, 2022.